What Is a Temporary Power Pole?
A construction temporary power pole has to meet the utility's clearance and grounding rules before it gets energized, so temporary power pole requirements always start with a call to the local utility, not with the electrician's truck showing up. Ask for a temporary power pole diagram from your electrician before the pole is ordered; it shows meter height, panel placement and grounding rod location so nothing gets set twice.
It is a freestanding pole, usually wood, with a meter socket, a breaker panel and outlets mounted on it, set near the road so the utility can run a line to it before the building has walls. Crews call it a temp pole or a construction pole. Most residential jobs in Erie run 200 amp service, which covers saws, compressors and a job trailer at the same time. Smaller renovation jobs sometimes get by on less. If you are staging a full construction site services package, the pole usually goes up alongside the temporary fence rental and before the portable toilet rental lands, since the electrician needs clear access to set the base.
How Does Temporary Power Pole Installation Work?
Installing a temporary power pole starts with a call to the utility to schedule the service drop, then a licensed electrician sets the pole, panel and grounding to code before anyone touches a saw. Erie Porta Pros delivers and positions the pole; we do not pull permits or wire it ourselves, and that split matters because inspections have to pass before power gets energized. Expect the pole set within a defined clearance of the property line, with enough room for the utility bucket truck to work. A roll-off dumpster rental or a 10 yard dumpster rental often sits near the same entrance, so we coordinate placement so the pole, the dumpster and any construction dumpster rental traffic do not compete for the same 10 feet of driveway. If your site also needs a light tower rental for early morning framing crews, that runs off the same temp service once it is live.

What Does a Temporary Power Pole Cost in Erie?
Temporary power pole installation cost depends on amperage, how far the utility has to run a line, and whether the electrician needs a second trip for inspection corrections. We do not publish flat pole pricing because it is quoted per job once the utility distance and panel size are known. What we can tell you: our other site equipment follows a public band, and a dumpster or fence delivered to the same job runs inside a known range.
| item | duration | typical range |
|---|---|---|
| standard porta potty | month | $125 to $325 |
| 10 yard dumpster | week | $426 to $778 |
| temporary fence | day | $30 to $75 |
See temporary fence cost and dumpster rental cost for the full breakdown on those. For sanitation on the same job, porta potty rental cost and monthly porta potty rental cover the toilet side.
Is a Permit Required for a Temporary Power Pole?
Placement in the public right of way or near a property line needs confirming with the City of Erie before the pole goes in; we do not guess at ordinance numbers on this page. Ask your electrician which permit covers the service drop and ask the city which covers the pole location. The same goes for dumpsters at the curb; see dumpster permit requirements and porta potty permit requirements before assuming a site plan covers everything. OSHA 1926.404(b)(1)(ii) requires ground fault circuit interrupter protection on construction sites, so confirm your electrician is wiring GFCI outlets into the temp panel, not just a bare breaker box.
How many amps does a construction temp pole need?
Most single-family residential builds run 200 amp service, enough for saws, a compressor and trailer lighting at once. Smaller remodel jobs sometimes use less. Your electrician sizes it against the load you expect, not against the size of the lot.
How long does temporary power pole installation take?
The pole itself goes up in a day once parts are on hand. The bottleneck is the utility scheduling the service drop and the inspector signing off, which can add days depending on their queue, not the electrician's.
Can Erie Porta Pros wire the temporary power pole?
No. We deliver and place the pole; a licensed electrician handles wiring, grounding and the utility connection. We coordinate delivery timing with your electrician so the pole is on site before their scheduled hookup date.
Does a temp pole replace permanent service later?
No. It is removed once permanent utility service is connected and inspected. Plan removal into your close-out schedule the same way you would schedule final pickup of a storage container rental or a 40ft storage container.
What else does a new build site near Millcreek need?
Sites 3.8 miles southwest in Millcreek typically pair a temp pole with fencing, a dumpster and a standard porta potty rental or an ADA accessible porta potty if the crew count requires one under OSHA 1926.51(c).

Next step
Get a delivery date
Tell us the address, the dates and the headcount. We size the order and confirm the route.